Wyre Electrical Limited

14/10/21 - 15/10/21 November-17-2021

JOB NICEIC Wolverhampton electricians  carried out replacement of 3 phase board in foundry unit and carried out testing. New meter installed. New emergency light installed

PREMISESIndustrial Electricians

LOCATION Wolverhampton  

Read more...

Electrician Wolverhampton
07733  346  836

 Wolverhampton Electrician covering all aspects of Domestic, Industrial and Commercial electrics. There is no job too small so get in contact with us for a free estimate or quote. We are NICEIC Approved Domestic Installers and have our own personal liability cover.

You can now get your homes electrics Inspected and Tested for £100
Your homes electrics are supposed to be tested every 10 years. Unsure of when they were last tested ? Get in touch and we will be happy to advise you.



Please include a phone number in your message if you wish to be contacted via phone.
Your Name:
Your Email Address:
Subject:
Your Message:
Please enter the phrase as it is shown in the box above.   

Wolverhampton Electrician Wolverhampton Electricians NICEIC Approved Domestic Installers Wolverhampton CCTV Electrician Wolverhampton Re wire Electrician Wolverhampton Security Alarm Electrician Wolverhampton Fire Alarm Electrician Wolverhampton Test And Inspect Electrician Wolverhampton Periodic Inspection Electrician Wolverhampton Electrical Installation Condition Report Wolverhampton 3 Phase Electrician Wolverhampton Single Phase Electrician Wolverhampton Industrial Electrician Wolverhampton Commercial Electrician Wolverhampton Factory Electrician Wolverhampton Earth Bonding Electrician Wolverhampton TT system Electrician Wolverhampton �Part P Electrician Wolverhampton Replace Lights Electrician Wolverhampton Local Electrician Wolverhampton Approved �Electrician Wolverhampton Electricians In Wolverhampton Wolverhampton Electricians Local Wolverhampton Electricians West Midlands Electricians Licensed Electricians West Midlands Electrician Domestic Electricians
Latest News


August 15, 2020
20/07/20 - 24/07/20

JOB NICEIC Sutton Coldfield electricians  carried out first fix electrics on bespoke house renovation. Install including network cabling to each room, alarm and cctv

PREMISES Domestic Electricians

LOCATION Sutton Coldfield 


August 15, 2020
13/07/20 - 17/07/20

JOB NICEIC Sutton Coldfield electricians  carried out first fix electrics in bespoke house renovation. Installation includes Full rewire, aerials, cat 5 network cabling, CCTV and Alarm system

PREMISES Domestic Electricians

LOCATION Sutton Coldfield 


August 15, 2020
06/07/20 - 10/07/20

JOB NICEIC Burntwood electricians  carried out Electrical Installation Condition Report on industrial unit. 3 phase supplies strtipped out. Repairs carried out to general electrics. Additional lighting installed in office areas. 50mm bonding installed. RCBO installed on factory sockets

PREMISES Industrial Electricians

LOCATION Burntwood 


August 8, 2020
29/06/20 - 03/07/20

JOB NICEIC Wolverhampton electricians  carried out Electrical Installation Condition Report on factory unit ready for new tennants. Traced fault on factory supply to roller shutter door. Replaced isolator for drill press machine. Installation of new led lighting in distribution area

PREMISES Commercial Industrial Electricians

LOCATION Wolverhampton WV1 


August 8, 2020
22/06/20 - 25/06/20

JOB NICEIC Walsall electricians  carried out repairs to spray booth extraction supply following fault.Isolator and starter replaced. New supply installed for lighting on seperate supply. Fault finding on low bay lighting supply in warehouse area. Replacement spot lights installed in showroom corridoor

PREMISES Industrial Commercial

LOCATION Aldridge Walsall 


August 6, 2020
18/06/20 - 19/06/20

JOB NICEIC Burntwood electricians  carried out repairs and removal of supplies for industrial unit to handed over to new tennants. Electrical Installation Condition Report carried out on Factory 3 phase board and multiple single phase boards

PREMISES Industrial Electricians

LOCATION Burntwood 


August 6, 2020
16/06/20 - 17/06/20

JOB NICEIC Walsall electricians  carried out installation of electrics in new garden room. SWA supply along with new computer cable for an additional wifi router and sky cable

PREMISES Domestic electricians

LOCATION Walsall 


August 6, 2020
15/06/20

JOB NICEIC Wolverhampton electricians  carried out installation of new 3 phase isolator supplying manufacturing unit

PREMISES Industrial Electricians

LOCATION Wolverhampton 


August 6, 2020
08/06/20 - 12/06/20

JOB NICEIC Wolvewrhampton elecricians  carried out installation of temperature gauge to check for abnormal temperatures in workers for protection of covid. Also installed work start and end time clocks as well as door bells

PREMISES Commercial manufacturing

LOCATION Wolverhampton 


August 6, 2020
2/06/20 -5/06/20

JOB NICEIC Walsall electricians  carried out installation of multiple car charging ports at commercial office buildings

PREMISES Commercial electricians

LOCATIONWalsall 


August 6, 2020
01/06/20

JOB NICEIC Walsall electricians  carried out installation of car charging points at offices. Individual SWA circuits RCD protected to outdoor sockets

PREMISES Commercial electricians

LOCATION Walsall 


August 5, 2020
25/05/20 - 29/05/20

JOB NICEIC Wolverhampton electricians  carried out repairs to commcerial manufacturing premises following failed Electrical Installation Condition Report

PREMISES Commercial electricians

LOCATION Wolverhampton 


August 5, 2020
19/05/20 - 22/05/20

JOB NICEIC Walsall electricians  carried out installation of new mini consumer unit to supply multiple new kitchen circuits following a refurb

PREMISES Domestic Electricians

LOCATION Walsall 


August 5, 2020
18/05/20

JOB NICEIC Wolverhampton electricians  carried out site maintenace of escape tunnel emergency lighting. Additional lighting installed with old lighting replaced for new LED lights. 

PREMISES Commercial site

LOCATION Wolverhampton 


August 5, 2020
11/05/20 - 15/05/20

JOB NICEIC Wolverhampton electricians carried out installation of new lighting in warehouse area

PREMISES Industrial Commercial electricians

LOCATION Wolverhampton 


August 5, 2020
04/05/20 - 08/05/20

JOB NICEIC Walsall electricians  carried out installation of 3 phase supplies in factory area supplying machines for manufacture of hand gels

PREMISES Industrial electricians

LOCATION Walsall 




Archives

©2011